Contract Number | PM/Specialist | Anticipated Selection Date | Description |
---|---|---|---|
2021-012 |
ECS Spec
James Redican
PM
Mohamed Noun
|
3/3/2021 | Subsurface Utility Engineering On-Call services |
2021-006 |
ECS Spec
Wale Abubakar
PM
Derek Boland
|
3/22/2021 | This project proposes to construct Phase 1 of the interim phase of SR303L from north of MC 85 to Van Buren Street. Three general purpose lanes will be constructed in each direction, with a transition back into Cotton Lane near Elwood Street. |